Two Unpublished Tests on the End-of-Life Artificial Turf Field: Recovered Infill Sand as Concrete Fine Aggregate, and Aged Turf Crumb as Asphalt Modifier — Open Research Proposals

A full-size artificial turf field leaves roughly 120 t of silica sand and 60 t of ground tire rubber (crumb infill) when removed, against 18 t of polymer carpet. Dry mechanical separation recovers sand and rubber at 99 % purity, yet neither recovered stream has been tested in the application that would absorb it, and in the United States removed fields go to landfill at USD 30,000–60,000 each. Two go / no-go research proposals, written so that any civil or environmental engineering laboratory with a partner recycler can run them: Proposal 1 — Sand. Recovered turf infill sand as fine aggregate in concrete and pressed pavers. Three field-age lots; ASTM C33 characterisation including residual rubber/polymer by sink–float and TGA; 0–100 % replacement mortar and concrete strength series; SPLP and monolithic tank leaching of hardened concrete for 6PPD-quinone (draft EPA Method 1634) and zinc; factory paver trial against ASTM C936 / EN 1338. ~14 months. Proposal 2 — Rubber. Aged turf-infill crumb as crumb-rubber modifier in asphalt. Fresh tire crumb in rubberised asphalt has been shown (2023) to release 6PPD-quinone far below the coho salmon LC50 of 0.095 µg/L; decade-old, sand-laden infill — whose loose-phase release does not decline with age (2025) — has not been tested. The proposal replicates the 2023 protocol on three aged lots alongside a fresh control, adds binder and mix performance, 52-week dosed rainfall leaching, a sorption arm, a 6PPD / 6PPD-Q mass balance through the 175 °C wet process including fume capture, which has not been reported, and (rev. 2) two further arms: a treatment train — bioretention soil media, biochar-amended media and granular activated carbon columns run on real crumb-stockpile leachate, with a bioassay on a 6PPD-Q-sensitive salmonid — and leaching under saturated, anaerobic, landfill-like conditions, so that the routing comparison (bound matrix vs lined landfill vs unlined) rests on a measurement. Field strip gated on a laboratory GO. ~14 months laboratory phase. Both proposals fix decision thresholds before the first specimen is cast and commit either outcome to publication with open data. A background article sets out the mass arithmetic, what is already proven (separation, fresh-crumb encapsulation, end-of-life LCA) and what is not. Every figure is tagged computed or cited. Standards designations are from working knowledge and must be confirmed against current editions; budgets are scoping ranges. Licence CC-BY-4.0. Anyone may run, adapt, or fund these proposals. v1.3.0 — adds a closing list of every stream in the series, each marked published, designed or open question, so a reader arriving by DOI sees the whole of the work rather than only this stream. No figure, source or conclusion in the article changed. v1.4.0 — expands the acronyms a general reader needs in order to judge the sources: PFAS, PE and PP. The companion research-proposal document is unchanged: its ASTM, SPLP and ICP-MS vocabulary is the working language of the laboratories it addresses. No figure, source or conclusion changed.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-09-20
DOI
https://doi.org/10.5281/zenodo.22035599
Citations
14
Primary Topic
Asphalt Pavement Performance Evaluation
Type
article
Field-Weighted Citation Impact
39.12
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Two Unpublished Tests on the End-of-Life Artificial Turf Field: Recovered Infill Sand as Concrete Fine Aggregate, and Aged Turf Crumb as Asphalt Modifier — Open Research Proposals

Anil Kumar Sharma
14 citations
Zenodo (CERN European Organization for Nuclear Research)
Asphalt Pavement Performance Evaluation
39.12
article

Two Unpublished Tests on the End-of-Life Artificial Turf Field: Recovered Infill Sand as Concrete Fine Aggregate, and Aged Turf Crumb as Asphalt Modifier — Open Research Proposals

Anil Kumar Sharma
article en
14 citations

Abstract

A full-size artificial turf field leaves roughly 120 t of silica sand and 60 t of ground tire rubber (crumb infill) when removed, against 18 t of polymer carpet. Dry mechanical separation recovers sand and rubber at 99 % purity, yet neither recovered stream has been tested in the application that would absorb it, and in the United States removed fields go to landfill at USD 30,000–60,000 each. Two go / no-go research proposals, written so that any civil or environmental engineering laboratory with a partner recycler can run them: Proposal 1 — Sand. Recovered turf infill sand as fine aggregate in concrete and pressed pavers. Three field-age lots; ASTM C33 characterisation including residual rubber/polymer by sink–float and TGA; 0–100 % replacement mortar and concrete strength series; SPLP and monolithic tank leaching of hardened concrete for 6PPD-quinone (draft EPA Method 1634) and zinc; factory paver trial against ASTM C936 / EN 1338. ~14 months. Proposal 2 — Rubber. Aged turf-infill crumb as crumb-rubber modifier in asphalt. Fresh tire crumb in rubberised asphalt has been shown (2023) to release 6PPD-quinone far below the coho salmon LC50 of 0.095 µg/L; decade-old, sand-laden infill — whose loose-phase release does not decline with age (2025) — has not been tested. The proposal replicates the 2023 protocol on three aged lots alongside a fresh control, adds binder and mix performance, 52-week dosed rainfall leaching, a sorption arm, a 6PPD / 6PPD-Q mass balance through the 175 °C wet process including fume capture, which has not been reported, and (rev. 2) two further arms: a treatment train — bioretention soil media, biochar-amended media and granular activated carbon columns run on real crumb-stockpile leachate, with a bioassay on a 6PPD-Q-sensitive salmonid — and leaching under saturated, anaerobic, landfill-like conditions, so that the routing comparison (bound matrix vs lined landfill vs unlined) rests on a measurement. Field strip gated on a laboratory GO. ~14 months laboratory phase. Both proposals fix decision thresholds before the first specimen is cast and commit either outcome to publication with open data. A background article sets out the mass arithmetic, what is already proven (separation, fresh-crumb encapsulation, end-of-life LCA) and what is not. Every figure is tagged computed or cited. Standards designations are from working knowledge and must be confirmed against current editions; budgets are scoping ranges. Licence CC-BY-4.0. Anyone may run, adapt, or fund these proposals. v1.3.0 — adds a closing list of every stream in the series, each marked published, designed or open question, so a reader arriving by DOI sees the whole of the work rather than only this stream. No figure, source or conclusion in the article changed. v1.4.0 — expands the acronyms a general reader needs in order to judge the sources: PFAS, PE and PP. The companion research-proposal document is unchanged: its ASTM, SPLP and ICP-MS vocabulary is the working language of the laboratories it addresses. No figure, source or conclusion changed.

Zenodo (CERN European Organization for Nuclear Research)
Redox Power Systems (United States) (US)
Life in Land
Openalex Percentile: Top 0%
Asphalt Pavement Performance Evaluation
39.12
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.